Works include reception desk, vending areas, copy areas, toilet fit out, doorsets, wall paneling , tea points, breakout areas, coat cupboards, coat cupboards, storage cupboards, wall paneling, credenzas, meeting room A/V walls, fabric wall paneling.
Works include reception desk, vending areas, copy areas, toilet fit out, doorsets, wall paneling , tea points, breakout areas, coat cupboards, coat cupboards, storage cupboards, wall paneling, credenzas, meeting room A/V walls, fabric wall paneling.
Project Spencer Stuart
Contractor Mitie
Architect Gensler
Value £900,000.00
Duration 14 Weeks
Our accreditations aren’t a tick-box exercise they underpin every project we deliver, from initial design through to final installation on site.
ISO 45001 & SSIP certified. Safety is non-negotiable on every project.
FSC certified timber. ISO 14001 environmental management across all operations.
ISO 9001, BM Trada fire door certification, and FORS Silver fleet accreditation.